![]() |
menu powered by Milonic
|
log in |
You are here: | Comments and remarks to Wim Jonker Klunne |
In further moves into the African energy market, Chinese group Sinohydro Corp has signed two turnkey contracts to develop a hydro project in Equatorial Guinea and another in Ghana. Sinohydro has also signed an EPC contract with the Ministry of Energy and Minerals in Equatorial Guinea to develop a 120MW run-of-river hydro project. The US$257M turnkey contract will include construction of a dam, flood discharge and sand gate, blast-hole, left bank water tunnel, a surge shaft, pressure pipeline and associated power house buildings. Construction period is 42 months. Additional information: News date: 13/04/2007 |
|