![]() |
menu powered by Milonic
|
log in |
You are here: | Comments and remarks to Wim Jonker Klunne |
A R17-million, 1 MW industrial grid-tied solar plant, placed atop the 100 000 square meter roof of Belgotex Floorcoverings' manufacturing facility in Pietermaritzburg, was set to come online in November. The new plant, which was installed by Sustainable Power Solutions within two-and-a-half months, was part of a new strategy by Belgotex to offset 5% of its carbon emissions. The system, comprising 4 080 polycrystalline modules, each rated at 245 Wp, was expected to yield about 1 415 MWh a year. Additional information: Project info sheet News date: 10/10/2013 |
|